Co. Dublin

Solar Panel Installation in Dún Laoghaire

A lot of Dún Laoghaire housing is period, so protected-structure status is worth checking early. Rooftop solar is exempt from planning in most cases, but protected structures are one of the specific exceptions.

Areas we cover around Dún Laoghaire

  • Glasthule
  • Sandycove
  • Dalkey
  • Killiney
  • Monkstown
  • Ballybrack
  • Shankill

What we install

  • Solar Panels
  • Battery Storage
  • EV Chargers

Serving this area from

The Mews, 59 Lower Kilmacud Road, Stillorgan, Co. Dublin

Getting solar installed in Dún Laoghaire

The SEAI grant

Up to €1,800 towards a domestic solar PV system of 4kWp or above, and up to €300 towards a home EV charger. We handle the paperwork and the grant is deducted from what you pay.

Planning permission

Since October 2021 rooftop solar is exempt from planning permission for most Irish homes. The exceptions are protected structures and a small number of zones near airports.

How long it takes

A survey first to confirm the roof and size the system properly, then a typical install of one to two days. Roof work and the electrical side usually run at the same time.

More detail on grants, sizing and maintenance is on our frequently asked questions page, or see what a home solar system involves.

    Solar Panel Installation in Dún Laoghaire | Renewables Ireland | Renewables Ireland